Newer
Older
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
/*
Copyright (c) ETSI 2019.
This software is subject to copyrights owned by ETSI. Non-exclusive permission
is hereby granted, free of charge, to copy, reproduce and amend this file
under the following conditions: It is provided "as is", without warranty of any
kind, expressed or implied.
ETSI shall never be liable for any claim, damages, or other liability arising
from its use or inability of use.This permission does not apply to any documentation
associated with this file for which ETSI keeps all rights reserved. The present
copyright notice shall be included in all copies of whole or part of this
file and shall not imply any sub-license right.
*/
Package TP_GX {
import all from Sip_Common;
Test Purpose {
TP Id TP_GX_PGW_RAA_01
//TP_EPC_6013_01 and TP_EPC_6014_01 from TS 103 029 V5.1.1
Test objective "IUT successfully processes all mandatory AVPs in an RA-Request received due provision of PCC rules and sends RA-Answer."
Reference
"TS 129 212 (V15.3.0) [9], clause 4.5.2"
Config Id CFG_GX_PGW_01
PICS Selection PICS_1
Initial conditions with {
the UE_A entity isNotRegisteredTo the IMS_A
}
Expected behaviour
ensure that {
when {
the EPC_PCRF_A entity sends an RAR containing
Charging_Rule_Install_AVP containing
Charging_Rule_Definition_AVP containing
Charging_Rule_Name_AVP containing
Flows_AVP containing
Media_Component_Number_AVP
indicating value 0
,
Flow_Status_AVP
indicating value ENABLED
;
;
;
;
;
to the EPC_PGW_A entity
}
then {
the EPC_PGW_A entity sends the RAA containing
Result_Code_AVP
indicating value DIAMETER_SUCCESS
;
to the EPC_PCRF_A entity
}
}
} // End of TP TP_GX_PGW_RAA_01
} // End of Package TP_GX