Commit c971c1b2 authored by Muhammad Umair Khan's avatar Muhammad Umair Khan
Browse files

minor update in federation integration options

parent 80b12230
Loading
Loading
Loading
Loading
+6 −6
Original line number Diff line number Diff line
@@ -327,14 +327,14 @@ The approach proceeds in three steps.

#### Step 1 – Completion of the Present GR Study

The present Group Report performs:
The present Group Report (GR) analyses:

- Detailed semantic gap between ETSI GS MEC 040 (Mff procedures) and GSMA PRD OPG.04 (EWBI Federation Management APIs), including relevant GSMA NBI elements.
- Mapping of lifecycle operations (Create, Update, Retrieve, Remove).
- Analysis of federation directionality, availability zone exposure, capability exchange, and notification models.
- Determination of required extensions to MEC information models.
- Analyse semantic differences between ETSI GS MEC 040  and GSMA PRD OPG.04.
- Assess lifecycle alignment between MEC Federation procedures and OPG.04 Federation Management APIs (included NBI APIs).
- Transformation requirements and architectural placement options.
- High-level architectural design options for integrating MEC Federation with GSMA Operator Platform components, including potential Transformation Function placement, MEFM enhancements, and interaction flows.

The outcome of this step is a technically validated gap analysis forming the basis for normative enhancement.
The outcome of this step is forming the basis for normative enhancement.

#### Step 2 – Normative Enhancement of ETSI GS MEC 040