Changes for test_purposes/E_CSCF/TP_E_CSCF.tplan2: 4 added lines, 4 removed lines.
Original line number
Diff line number
Diff line
/*
Copyright (c) ETSI 2023.
Copyright (c) ETSI 2025.
This software is subject to copyrights owned by ETSI. Non-exclusive permission
is hereby granted, free of charge, to copy, reproduce and amend this file
@@ -228,7 +228,7 @@ Package TP_E_CSCF {
Test objective "Verify that the E-CSCF successfully processes an callback INVITE from PSAP over the IM CN subsystem of own network and routes the request to the P-CSCF."
Reference
"ETSI TS 123 167 [1], Clause 4.1 item 12"
"ETSI TS 123 167 [10], Clause 4.1 item 12"
Config Id CF_VoNR_INT_ES
@@ -374,7 +374,7 @@ Package TP_E_CSCF {
Test objective "Verify that the E-CSCF successfully processes a callback INVITE from the PSAP in another network over the IBCF and routes the request to the P-CSCF."
Reference
"ETSI TS 123 167 [1], Clause 4.1 item 12"
"ETSI TS 123 167 [10], Clause 4.1 item 12"
Config Id CF_VoNR_INT_ES
@@ -522,7 +522,7 @@ Package TP_E_CSCF {
Test objective "Verify that the E-CSCF successfully processes a callback INVITE from PSAP in the PSTN over BGCF and routes the request to the P-CSCF."