Commit ca6a2857 authored by Bostjan Pintar's avatar Bostjan Pintar
Browse files

Reference number updated

parent 8a0d4624
Loading
Loading
Loading
Loading
+4 −4
Original line number Diff line number Diff line
/*
Copyright (c) ETSI 2023.
Copyright (c) ETSI 2025.

This software is subject to copyrights owned by ETSI. Non-exclusive permission
is hereby granted, free of charge, to copy, reproduce and amend this file
@@ -228,7 +228,7 @@ Package TP_E_CSCF {
        Test objective  "Verify that the E-CSCF successfully processes an callback INVITE from PSAP over the IM CN subsystem of own network and routes the request to the P-CSCF."
        
        Reference 
            "ETSI TS 123 167 [1], Clause 4.1 item 12"
            "ETSI TS 123 167 [10], Clause 4.1 item 12"
        
        Config Id CF_VoNR_INT_ES
        
@@ -374,7 +374,7 @@ Package TP_E_CSCF {
        Test objective  "Verify that the E-CSCF successfully processes a callback INVITE from the PSAP in another network over the IBCF and routes the request to the P-CSCF."
        
        Reference 
            "ETSI TS 123 167 [1], Clause 4.1 item 12"
            "ETSI TS 123 167 [10], Clause 4.1 item 12"
        
        Config Id CF_VoNR_INT_ES
        
@@ -522,7 +522,7 @@ Package TP_E_CSCF {
        Test objective  "Verify that the E-CSCF successfully processes a callback INVITE from PSAP in the PSTN over BGCF and routes the request to the P-CSCF."
        
        Reference 
            "ETSI TS 123 167 [1], Clause 4.1 item 12"
            "ETSI TS 123 167 [10], Clause 4.1 item 12"
        
        Config Id CF_VoNR_INT_ES