Changes for ttcn/AtsNGAP/NGAP_TestCases.ttcn: 251 added lines, 0 removed lines.
Original line number
Diff line number
Diff line
@@ -2222,34 +2222,285 @@ module NGAP_TestCases {
groupUE_Mobility_Management_Procedures{
//8.4.1
groupHandover_Preparation{
/**
* @desc "Verify that the AMF node successfully processes a HANDOVER REQUIRED message contains mandatory IEs and answers with HANDOVER COMMAND with successfully handover."
* @desc "Verify that the AMF node successfully processes a HANDOVER REQUIRED message contains mandatory IEs and answers with HANDOVER PREPARATION FAILURE because the UE is not longer available."
* @desc "Verify that the AMF node successfully processes a PATH SWITCH REQUEST message that contains mandatory IEs and answers with PATH SWITCH REQUEST ACKNOWLEDGE to acknowledge the path switch."
* @desc "Verify that the AMF node successfully processes a PATH SWITCH REQUEST message that contains mandatory IEs and two PDU Sessions with same ID and answers with PATH SWITCH REQUEST FAILURE."
* @desc "Verify that the AMF node successfully processes a HANDOVER CANCEL message that contains mandatory IEs and answers with HANDOVER CANCEL ACKNOWLEDGE to confirm that the ongoing handover was cancelled."