Test objective "Verify that the AMF node successfully processes a HANDOVER REQUIRED message contains mandatory IEs and answers with IHANDOVER PREPARATION FAILURE with failed handover."
Test objective "Verify that the AMF node successfully processes a HANDOVER REQUIRED message contains mandatory IEs and answers with HANDOVER PREPARATION FAILURE because the UE is not longer available."
Test objective "Verify that the NG-RAN node successfully processes a UE CONTEXT MODIFICATION REQUEST contains mandatory IEs and answers with UE CONTEXT MODIFICATION FAILURE with failed PDU session."
Test objective "Verify that the NG-RAN node successfully processes a UE CONTEXT MODIFICATION REQUEST contains mandatory IEs and answers with UE CONTEXT MODIFICATION FAILURE because the UE is no longer available."
Reference
"ETSI TS 138 413 [1], Clauses 8.3.4.3"
@@ -807,7 +807,7 @@ Package TP_GNB {
PICS Selection PICS_A2/1 and PICS_A3/2_4
Initial conditions with {
the UE entity isRegisteredTo the AMF // TODO; check initial conditions