ETSI Repository
LIBS / LibIms
DIAMETER / DiameterCxDx
DIAMETER / DiameterGx
DIAMETER / DiameterRfRo
DIAMETER / DiameterRx
DIAMETER / DiameterS6a
DIAMETER / DiameterS9
DMR / DMR (Digital Mobile Radio)
DMR / dPMR (Digital Peer-to-Peer Mobile Radio)
ePassport / ePassport Readers Interoperability Support
Evolved Packet Core / NAS
Evolved Packet Core / S1AP
GTP / GPRS Tunneling Protocol (GTP)
IMS / Basic Call
IMS / IMS Interoperability Tests
IMS / IMS ISUP Interworking
IMS / IMS ISUP Interworking, profile C
IMS / Network Integration Testing SIP-SIP
IMS / Supplimentary Services
IoT / 6LoWPAN
IPv6 / IPv6
ITS / DSRC_HDR
ITS / ECall_HLAP
ITS / ITS ASN.1 modules
ITS / ITS-S
ITS / ITS-S DSRC Coexistence
ITS / Wireshark plugin for ITS
LIBS / LibCommon
LIBS / LibDiameter
LIBS / LibGtpv2C
LIBS / LibIPv6
LIBS / LibIts
LIBS / LibSip
MEC / MEC Modules
TTCN-3 Compiler Tests / TTCN-3 Part 1
TTCN-3 Compiler Tests / TTCN-3 Part 9
(LibIms)
/
tags/
@ 1
- Rev 97
Rev
Go to most recent revision
|
Show changed files
|
Directory listing
|
SVN
|
Bug Tracker
Filtering Options
From rev
To rev
Max revs
Search history for
Show All
The credentials to download the source code are:
Username:
svnusers
Password:
svnusers
Rev
Age
Author
Path
Log message
Diff
97
2010-08-10 13:30:34
pintar
/tags/TAG_V005_LibIms_PlugtestLanion2009_STF370/ttcn/
STF370 - mw interface
Code was validated within plugtest in Lanion 2009.
TAGV5 was made on 10.8.2010 and also TAGV5 was
done for LibSIP and LibIMS
following developement will be done under
STF407 - ic interface for "next plugtest"
95
2010-08-10 13:27:46
pintar
/tags/
STF370 - mw interface
Code was validated within plugtest in Lanion 2009.
TAGV5 was made on 10.8.2010 and also TAGV5 was
done for LibSIP and LibIMS
following developement will be done under
STF407 - ic interface for "next plugtest"
94
2010-08-10 13:27:29
pintar
/tags/TAG_V5_LibIms_PlugtestLanion2009_STF370/
STF370 - mw interface
Code was validated within plugtest in Lanion 2009.
TAGV5 was made on 10.8.2010 and also TAGV5 was
done for LibSIP and LibIMS
following developement will be done under
STF407 - ic interface for "next plugtest"
87
2010-02-23 08:40:41
pintar
/tags/TAG_V004_LibIms_2010_week08/ttcn/
TAG_V004_2010_week08 - end of validation at Iskratel/Slovenia
86
2010-02-23 08:35:56
pintar
/tags/TAG_V004_LibIms_2010_week08/
80
2009-12-04 11:54:21
pintar
/tags/TAG_V003_LibIms_2009_week49/ttcn/
TAG_V3 - ATS phase STF346, STF366, STF368, STF369
Version3 after STF346 validation on Iskratel IMS SUT
79
2009-12-04 11:49:08
pintar
/tags/TAG_V003_LibIms_2009_week49/
TAG_V3 - ATS phase STF346, STF366, STF368, STF369
Version3 after STF346 validation on Iskratel IMS SUT
71
2009-10-16 10:10:27
pintar
/tags/TAG_V002_LibIms_2009_week42/ttcn/
commited work from week 41 and 42 (year 2009)
first validation of STF346 project on Iskratel IMS
70
2009-10-16 10:06:22
pintar
/tags/TAG_V002_LibIms_2009_week42/
68
2009-10-15 17:54:53
pintar
/tags/
67
2009-10-15 17:48:10
pintar
/tags/TAG_V1_LibIms_beforeValidation/ttcn/
TAG_V1 - ATS phase STF346, STF366, STF368, STF369
Version1 before validation
66
2009-10-15 17:47:08
pintar
/tags/TAG_V1_LibIms_beforeValidation/
1
2009-03-23 10:01:11
schulzs
/
first structure